Project Portfolio

Nationwide

<img class="aligncenter wp-image-215" src="https://candc.london/wp-content/uploads/2015/06/Nationwide-Catering-Equipment-04.jpg" alt="Nationwide-Catering-Equipment-04" width="685" height="455" srcset="http://candc webpage.london/wp-content/uploads/2015/06/Nationwide-Catering-Equipment-04.jpg 495w, https://candc.london/wp-content/uploads/2015/06/Nationwide-Catering-Equipment-04-300×199.jpg 300w, https://candc.london/wp-content/uploads/2015/06/Nationwide-Catering-Equipment-04-207×136.jpg 207w, https://candc.london/wp-content/uploads/2015/06/Nationwide-Catering-Equipment-04-140×94.jpg 140w” sizes=”(max-width: 685px) 100vw, 685px” />

C&C have completed the supply and installation of catering facilities at Nationwide, London.

The Project, valued at approximately £250k, saw C&C work closely alongside foodservice consultants Tricon and builder Mace/Como.

Spanning over 3 floors, C&C installed a Servery counter on the 5th Floor, Pantry and Main Kitchen on the 6th Floor for Staff and Nationwide Clients and a 7th Floor Pantry for the Directors.

Follow this link for a full project gallery and story